What to include on a site plan for a building permit

A site plan is usually the first drawing a plan reviewer looks at. It shows where the work is happening on the lot, how close it sits to the property lines, and whether it conflicts with easements, utilities or drainage. If the site plan is incomplete, the rest of the application often waits.

This guide walks through what most building departments in the US expect to see on a residential or light commercial site plan, the most common reasons plans are returned for corrections, and how to make sure you are working from the right checklist for your city or county.

★★★★★ 5.0 from 672 client reviews Top Rated on Fiverr8+ years of draftingOvernight turnaround Every project reviewed by a checker

The basics every site plan needs

Requirements vary from one jurisdiction to the next, but a handful of items appear on almost every permit checklist. Start with these and you will cover most of what a reviewer needs to orient themselves.

Property lines should be drawn from a current boundary survey or recorded plat wherever possible, not estimated from aerial images. Reviewers compare the site plan against records, and a lot shape that does not match is an easy reason to reject a submittal.

  • Property lines with bearings or angles and dimensions for each line
  • North arrow, so the reviewer can relate the drawing to the street and neighbors
  • Scale, stated in words or as a ratio, plus a graphic scale bar so printed copies can still be measured
  • Street names and the address of the property, with the lot and block or parcel number if available
  • A title block with the owner's name, project address, who prepared the drawing, the date and a revision number

Structures, setbacks and easements

This is the heart of the plan. The reviewer wants to see what is already on the lot, what is being added, and whether the new work respects the required setbacks. Show existing and proposed work clearly, using different line weights, hatching or labels so nobody has to guess which is which.

Setbacks should be dimensioned from the property line to the closest point of the structure, which may be a roof overhang, a porch or a step rather than the wall. Check how your local code measures setbacks before you draw them. Easements matter just as much: building over a utility or drainage easement is a common cause of rejection, and many departments want the easement width and type labeled.

  • Existing buildings, sheds, pools, decks and fences, with outside dimensions
  • Proposed structures with overall dimensions, labeled clearly as proposed
  • Distances from each proposed structure to every nearby property line
  • Distances between buildings where separation rules apply
  • Required setback lines, if your department asks for them to be drawn
  • Recorded easements with width and purpose (utility, drainage, access)

Access, utilities and drainage

Beyond the buildings themselves, most site plans need to show how people and vehicles reach the property and how water and services move around it. The level of detail depends on the project. A small shed may only need its location; a new house or commercial building usually needs much more.

Where the property is in or near a flood zone, the department may ask for the flood zone designation, base flood elevation or finished floor elevation to be noted. If you are unsure whether this applies, ask the permit office or check the checklist before you submit.

  • Driveways, sidewalks, parking areas and curb cuts, with widths
  • Water, sewer or septic, electric and gas service locations where relevant
  • Wells and septic tanks or drain fields, which often have their own separation rules
  • Drainage arrows, swales, and spot elevations if grading changes
  • Flood zone notes and elevations where the property is in a mapped flood area
  • Trees, retaining walls or other site features that the local checklist calls out

Impervious area and lot coverage

Many cities and counties limit how much of a lot can be covered by buildings or hard surfaces. When they do, they usually ask for a small table on the site plan showing the lot area, the existing and proposed building footprint, and the impervious area (roofs, driveways, patios, pool decks and similar surfaces).

Keep this table simple and make sure the numbers add up. Reviewers check the math, and a coverage figure that does not match the drawing will be flagged. If your department does not ask for coverage calculations, you can leave them off, but it is worth knowing whether a limit applies before you design a large addition.

Common reasons site plans get sent back

Most corrections are not about the design itself. They come from missing information or a drawing that is hard to read. The list below covers the issues plan reviewers raise most often. Running through it before you submit can save a round of comments.

  • No scale, the wrong scale, or a drawing that does not match its stated scale when printed
  • Missing setback dimensions, or setbacks measured to the wall instead of the overhang
  • Easements left off, or a proposed structure drawn over an easement
  • Existing structures not shown, so the reviewer cannot check total coverage or separation
  • Lot dimensions that do not match the survey or recorded plat
  • Proposed and existing work not clearly distinguished
  • Illegible text, cluttered layers or a sheet size the department does not accept
  • Missing owner, address or preparer information in the title block

Always check the local checklist

There is no single national site plan standard. Each building department publishes its own submittal requirements, and HOAs, zoning offices and flood plain administrators may add their own. Before you draw, download the current checklist from your city or county website or call the permit office, and confirm sheet size, scale, required notes and whether a signed survey must be attached.

Where a professional seal is required, the licensed surveyor, engineer or architect on the project is responsible for it. A drafting service can prepare a clean, complete drawing, but it does not sign or certify it.

If you would rather not draw the site plan yourself, DAN Plan prepares permit site plans in AutoCAD from your survey and sketch, delivered as DWG and PDF. Every drawing is checked before delivery, revisions are included, and standard drawings are usually turned around overnight. Single projects start from $80.

Sample drawings

Real production work, with client and property details removed. Click a sheet to enlarge.

Site plan for a proposed steel carport: Permit drawing · setbacks and easements
Site plan for a proposed steel carportPermit drawing · setbacks and easements
Boundary survey with proposed garage addition: Residential lakefront lot · curve table, elevations
Boundary survey with proposed garage additionResidential lakefront lot · curve table, elevations
Boundary survey: Large residential lot · setbacks, pool, septic
Boundary surveyLarge residential lot · setbacks, pool, septic

Questions

Common questions about this service.

Can I draw my own site plan for a permit?

In many jurisdictions homeowners can submit their own site plan for simple projects such as sheds, fences or small additions, as long as it is accurate and to scale. Some departments require a plan based on a recent survey, and larger projects often need a plan prepared or sealed by a licensed professional. Check with your permit office.

What scale should a site plan be drawn at?

It depends on the lot size and the sheet size the department accepts. The key is to pick a standard engineering or architectural scale that fits the whole lot on one sheet and keeps text readable, state it clearly, and include a graphic scale bar. Some checklists specify a scale, so confirm before drawing.

Do I need a survey to make a site plan?

Not always, but it is the most reliable starting point. Property lines, easements and existing structures should come from a current survey or recorded plat. Many departments require a survey for new buildings or work close to a property line.

Is a site plan the same as a plot plan?

The terms are often used interchangeably for permits, although some departments use plot plan for simpler residential drawings and site plan for more detailed ones. Our guide on site plans, plot plans and surveys explains the differences.

How long does it take to get a site plan drawn?

Drafting time depends on the size of the project and how complete your information is. A simple residential plan with a clear survey and sketch can be drawn quickly, while commercial plans with parking, grading and coverage tables take longer. Permit review time is separate and set by your department.

Related

Send us your survey and a sketch of the work, and we will draft a permit-ready site plan, usually overnight, from $80.

CONTACT

Try us on one current job

Tell us what you need and we will reply within about an hour during working days. For companies the first test drawing is free.

Prefer email? Write to us from any mailbox:
drafting@newsiteplan.com
Open in Gmail Outlook.com

Or order through our Fiverr profile ↗

📎 Attach files or drop them here
Survey sketch, field notes, old plan, photos · PDF, DWG, DXF, JPG, ZIP… · up to 10 files, 50 MB each
    ×