Sheds, garages, carports and patios are among the most common building projects in Australia, and they are usually classed as Class 10a structures under the building rules. Some are small enough to be exempt from approval. Many are not, and those need a set of drawings before work can start.
This guide explains, in general terms, which drawings a council, private certifier or building surveyor usually expects for these structures, what each drawing should show, and how shed and patio dealers can organise their paperwork to avoid back-and-forth that holds up jobs.
Every state and territory sets its own rules for when a shed, carport or patio can go up without approval, and councils can add local controls on top. Exemptions usually depend on things like the size and height of the structure, how close it is to boundaries and other buildings, whether it sits over an easement or sewer, and whether the land is affected by heritage, bushfire, flood or overlay controls.
Because those limits differ between states and sometimes between councils, do not rely on a figure you have seen for another area. Check your state planning portal and your council or shire before ordering a kit. Where approval is needed, the path also varies: it may be a building permit, a building approval through a private certifier, a complying development certificate (CDC) in NSW, or a development application (DA) to council where the proposal does not fit the fast-track rules.
The site plan is usually the drawing that gets the most attention, because it shows whether the structure fits on the block within the setback and siting rules. It should be drawn to scale from a reliable source, such as a survey, a title plan or the council's lot information.
A clear site plan for a shed, carport or patio typically shows:
Most approvals also need drawings of the structure itself. For a kit shed, carport or patio these are usually straightforward: a floor plan showing the footprint, column positions, doors and openings, and elevations showing the height of the walls and roof, roof pitch and finished ground level. Some certifiers also ask for a section through the structure.
Engineering is normally supplied by the kit manufacturer or supplier. Steel sheds and patios are typically designed for a site's wind classification and include footing details, member sizes and connection details. Make sure the engineering you submit matches the size and wind rating of the structure on the drawings, as mismatches are a common reason for requests for further information.
Attached patios and carports may also need details of how they connect to the existing house, such as fixing to the fascia or roof structure. Again, this usually comes from the supplier's engineering or the project engineer.
In most states, building approval for Class 10a structures is assessed by a building certifier or building surveyor, who may work for council or privately. They check the drawings and engineering against the building rules and any planning requirements, and they issue the approval or permit when everything is in order. They may also inspect footings or the finished structure.
The certifier is the person you need to satisfy, so it is worth finding out early what they want to see. Many have their own checklists for sheds and patios. Planning matters, such as overlays or a DA, may go to council separately before or alongside building approval.
Drawings for these structures generally do not need to be prepared by an architect, but responsibility for the application sits with the owner, builder or applicant, and engineering is the supplier's or engineer's responsibility.
Dealers who handle approvals for their customers see the same issues repeatedly. A few habits make a real difference to how quickly jobs get through.
If drawing site plans and elevations is slowing down your sales or approvals, DAN Plan prepares council approval drawings for sheds, carports, garages and patios in AutoCAD, delivered as DWG and PDF in your own template. Every drawing is checked before delivery and revisions are included. We do not sign or certify drawings, and engineering stays with your supplier. Companies can start with a free test drawing to see the quality before committing.
Real production work, with client and property details removed. Click a sheet to enlarge.
Common questions about this service.
It depends on its size, height and position on the block, and on your state rules and any council overlays. Small garden sheds are often exempt, while larger sheds, garages and many carports and patios need approval. Check your state planning portal and council before buying.
Usually a building certifier or building surveyor, either at council or in private practice. In some cases a planning approval or DA from council is also needed. In NSW, many structures can go through a complying development certificate if they meet the criteria.
Kit sheds and patios usually come with engineering from the manufacturer, designed for your site's wind classification. Make sure it matches the exact structure you are building. Custom or unusual structures may need an engineer engaged separately.
Use a standard scale that fits the whole block on the sheet with readable text, and show it clearly with a scale bar. Your certifier or council may specify sheet size or scale, so check their checklist.
Yes, many shed and patio dealers prepare or organise approval drawings as part of their service. The application is lodged by the owner, builder or applicant under the relevant state process.
Send us one of your next shed, carport or patio jobs and we will prepare the first approval drawing free, so you can judge the quality yourself.
Tell us what you need and we will reply within about an hour during working days. For companies the first test drawing is free.